Removal
1. Prepare the car for work and disconnect the terminal from the negative terminal of the battery (see "Preparing a car for technical inspection and repair").
2. Remove the gear shift handle together with the cover (see "Gear shift drive - removal, disassembly, installation and adjustment").
3. Using a Phillips screwdriver, unscrew the screw securing the right instrument panel console trim.

4. Move it forward and remove the cover.

5. Remove the left cover in the same way.
6. On the right and left sides of the tunnel, use a Phillips screwdriver to unscrew the two screws securing the front lining of the floor tunnel.

7. Using a Phillips screwdriver, unscrew the three screws securing the parking brake lever trim.

8. Remove the lever trim. After lifting the parking brake lever, use a Phillips screwdriver to unscrew the screw securing the indicator lamp switch. We disconnect the wiring block from the switch.

9. Using a Phillips screwdriver, unscrew the screw securing the rear lining of the floor tunnel through the hole in the switch bracket.

(Original posted on the website LadaMan.ru)
10. Lift the floor tunnel trim above the gear shift lever and turn it over.

11. Disconnect the wiring harness from the cigarette lighter.

12. Using a screwdriver, remove the diagnostic connector block from the opening in the trim.

13. Using a Phillips screwdriver, unscrew the two screws securing the fuse box and detach the box from the trim.

14. Remove the floor tunnel lining.
Installation
We install the floor tunnel lining in the reverse order.
