1. Hang the front of the car on supports or raise the car on a lift.
2. Remove the engine mudguard from the car (see «Removal and installation of a mudguard of the engine»).
3. Before removing the power unit rear support cushion, place a jack or support under the gearbox housing.
4. To replace the rear engine mount, unscrew the left nut...
5.... and unscrew the right nut securing the engine mount to the body.
6. Turn out three bolts of fastening of an arm of a back support of the engine to a case of a transmission and remove an arm together with a pillow.
7. Clamp the bracket of the rear engine mount in a vise, unscrew the bolt securing the rear support cushion to the bracket and remove the cushion.
8. Install the pillow of the rear support of the power unit in the reverse order of removal, orienting it during installation so that the protrusion on the bracket is installed between the two protrusions on the inner clip of the pillow...
9....a longer arm (shown by arrow) its outer race was directed towards the right side of the car.
10. Before removing the pillow of the left front engine mount, place a jack or support under the gearbox housing.
11. Turn out a bolt of fastening of a pillow to a side member of a body.
12. Turn away two nuts of fastening of a pillow of the engine to a side member of a body.
13. Turn out two bolts of fastening of a pillow engines to an arm and remove a pillow.
14. Establish a pillow of the left support of the engine in an order, the return to removal.
15. Before removing the pillow of the right front engine mount, install a jack or support under the right support bracket.
16. Turn out a bolt of fastening of a pillow to a side member of a body.
17. Turn away two nuts of fastening of a pillow to a side member of a body.
18. Turn out two bolts of fastening of a pillow of the engine to an arm of a support...
19.... and remove the engine mount.
20. Establish a pillow of the right support of the engine in an order, the return to removal.